About Meiden

Milestones

1975

1-2_ph01.jpg

Meiden Singapore was established by Meidensha Corporation of Japan.

1979

1-2_ph02.jpg

Opening of distribution transformer plant (up to 5MVA).

1987

1-2_ph03.jpg

Completion of the first MRT line (North-South & East-West) power supply system.

1995

1-2_ph04.jpg

Obtained ISO 9001

1-2_ph05.jpg

Opening of switchgear / controlgear plant (up to 36kV).

1997

1-2_ph06.jpg

Installation of two 400kV 720MVA Power Transformers at Tuas Power Station.

1998

1-2_ph07.jpg

Opening of a VCB production facility (up to a rated breaking current of 31.5kA)

2002

1-2_ph08.jpg

Completion of the power supply system for MRT Changi Airport Line.

2003

1-2_ph09.jpg

Production commenced for switchgear protection/control panels (for up to 420kV systems)

2004

1-2_ph10.jpg

Completion of Manila Metro Line 2 power supply system (AC & DC).

2006

1-2_ph11.jpg

Opening of power transformer plant (up to 154kV, 100MVA), the biggest in Singapore.

2007

1-2_ph12.jpg

Commissioning of 230kV/230kV, 500MVA phase-shift transformer, the biggest in Singapore.

2008

1-2_ph13.jpg

Commissioning of 36 66kV GIS bays for SPPG substations.

2009

1-2_ph14.jpg

Completion of MRT Boon Lay Extension power supply system.

2010

1-2_ph15.png

Obtained ISO 14001

1-2_ph16.jpg

Establishment of Water Technology Division.

2011

1-2_ph17.jpg

Production commenced for 750V DC switchgear.

1-2_ph18.jpg

Installation of an industrial wastewater recycling testbed facility for PUB, the first of its kind in Southeast Asia

2012

1-2_ph19.jpg

Delivery of the 20,000th transformer.

2013

1-2_ph20.jpg

Obtained
OHSAS 18001
BizSAFE STAR
ISO/IEC 17025 Chemical/Biological Testing certification and accreditation

1-2_ph22.jpg

Opening of the new Meiden Singapore HQ Building.

2014

1-2_ph21.jpg

Installation of industrial wastewater recycling plant for PUB, the first in Southeast Asia.

1-2_ph24.jpg

Delivery of the 20,000th switchgear.
Meiden is top seller in Singapore

2015

1-2_ph23.jpg

Opening of Ceramic Membrane Technology Centre.

1-2_ph25.jpg

Commissioning of a 75 MVA gas-insulated transformers at a SPPG substation.